Starting in 2001, the hull was created with insulating foam and two steel rods
The Sail was constructed with insulating foam and dowel rods
Here is the finished master of the hull and the sail
This is my friend Darrell, doing the glass lay-up in the female mold that he made of the master
Here is the first hull out of the mold (August 2002) and the rudders attached
Here is the dive plane linkage... this area is very limited vertically so the "crankshaft idea" was created
Missile deck after untold hours of scribing
This is a working Missile for the Typhoon
The Starboard Index lip installation (checks to see if you have enough clamps)
The Pert antenna will be controlled by a pump (working on a microcontroller to take servo pulses and control the pump direction and to time motor on/off)
Rudder linkages (These were home made on my new lathe)
Here are the completed stern tubes
2006 - FINALLY got back into working on Sub's - Here is the prototype of the bow plane extension mechanism

Typhoons Bow Plane Mechanism video

The prop blade and hub for the left master next to a picture of the original